How Park Project

Project Overview
Project StatusDesign 
Current Park Features
Playground, basketball courts, dog park, and lawn
City Departments
Department of Community Development and Planning (DCDP)
Department of Public Works (DPW)
Recreation Department 
Design Team
CBA Landscape Architects
Construction Contractor
TDB
Project ContactMichelle Moon, Senior Planner - Open Space


Timeline

Design & Community EngagementFall 2023  -- Fall 2024
Construction DrawingsWinter 2024/2025
Construction for Phase 1  - Playground

2025

Construction for Phase 2TBD


About the How Park Design Process

The City of Watertown is working with a designer to develop a Master Plan for How Park. Currently, the City has funding for Phase 1 of construction, which will be the renovation of the playground area. So far, we have held two meetings to seek input from the public and made an online survey available to collect feedback. A third meeting will be scheduled in early 2024 to reveal a preferred Master Plan concept - stay tuned for more information!

Summary of Meeting #1

During the first community meeting held at How Park on August 29, 2023, residents were presented with image boards that showed potential elements to include in the park and had the opportunity to speak with the design team and the City to ask questions and share their own ideas on future improvements. Below are the boards that community members used for sticker voting to express their preferences. The feedback we received from residents during the first community meeting helped guide the design of the three master plan design concepts.

Summary of Meeting #2 and Public Survey

On November 14, 2023, City staff and the design team hosted a tabling session at City Hall to review and receive feedback from the community on the three master plan concepts (linked below). An online survey was also open to the public during this time. With 59 respondents participating in the survey, valuable input was gathered from the community. Comments received from participating community members at the tabling session and the public survey will inform the preferred proposed design and Phase 1 construction at the park (playground area only).

a file



Designs & Community Presentations

Upcoming Meetings

  • Park Redesign Open House: October 9th, 4 - 6:30pm at Watertown Public Librarya file